Velimeşe OSB Wastewater Treatment Facilities

2018

Project Info

Investor: Tekirdağ Velimeşe Organized Industrial Zone

Employer: Türkerler Holding - Yüksel İnşaat A.Ş.

Debate of the plant: 200.000 m3 / day

Physical Treatment: Mechanical Coarse Grid, Mechanical Fine Grid

Pre-Treatment:Ventilated Sand and Oil Holder

Chemical Treatment: Fast Mixing, Slow Mixing, Chemical Precipitation

Biological Treatment: Bio-Phosphorous Pools, Anoxic- Aerobic Pools, Biological Precipitation

Sludge Dewatering:Sludge Pool, Decanter

Services

Within the scope of the projects (11.150kVA) Wastewater Treatment Facilities in Tekirdağ Velimeşe Organized Industrial Zone;

  • Drawing general systems of electricity, substructure, scada, power and instrument application projects,
  • Installment statements, panel expansions, power and scada column schemes and preparing the electrical calculationss,
  • Preparing the quantity file.

taha, rüstem, demirhan, elektrik, elektronik, mühendis, kocaeli, kocaeli elektrik, kocaeli proje, kocaeli elektrik proje, izmit, izmit elektrik, izmit proje, izmit elektrik proje, elektrik, proje, trafo, bakım, müşavir, elektronik, gebze, gölcük, gölcük elektrik, başiskele, başiskele elektrik, kartepe, derince, körfez, elektrik projesi, elektrik proje, proje çizimi, akıllı ev, otomasyon, otomatik ev